Waterways Ireland Surveys

WATERWAYS IRELAND SURVEYS

Four architectural, engineering and industrial heritage surveys were completed on behalf of Waterways Ireland along The Grand Canal, They Royal Canal, The Shannon-Erne Waterway and The Grand Canal Barrow Line and Barrow Navigation. This involved inspection and recording of 1,246 sites and structures, all carried out in a period of 69 days. The fieldwork required the use of a 22ft Seamaster boat, and in total 472km of waterways were investigated by the Rubicon team. In addition a comprehensive desktop and baseline study of all the waterways was compiled.

Rubicon staff during the Waterways Ireland Survey

Rubicon staff during the Waterways Ireland Survey